- This event has passed.
Mineral Point Road: Potential Lane Reduction & Parking Removal

Background Information: City Traffic Engineering is looking into the potential of permanently reducing Mineral Point Road, along the resurfacing section, from four lanes to two lanes with a center left-turn lane and bike lanes.
Preliminary observations show that the on-street parking is not highly utilized and traffic volumes are low enough to accommodate the lane reduction. This “road diet” will require all on-street parking to be permanently restricted, along this stretch. City Traffic Engineering will present data and ask for feedback on this proposal.
Listening Session: On December 19th at 5pm, the City Engineering and Traffic Engineering will be making a short presentation regarding the Resurfacing Projects and will be answering questions.
Registration:
https://cityofmadison.zoom.us/webinar/register/WN_9kOVxjMdR9KzgCrqPvaa1A#/registration
Additional information can be found on Resurfacing Web Site:
http://www.cityofmadison.com/engineering/projects/resurfacing-program
Have a great week everyone.
WNA Board
